ACT-43 · Replacement of spring traction and probe tensioning screws.

Description

With the machine turned off and disconnected from the tractor, remove the plastic fairing of the probe from the intervine, loosen the screw that holds the traction spring at the end of the plate and release the spring. Remove both screws replacing them with new screws, first place the short screw on the side of the shaft and fix it with the counter-nut, then place a new traction spring and proceed to place the long screw at the end of the plate and tension it until you get the necessary tension on the rod for the probe to work properly.

Compatible machine families

BIOCOMBICULTIFRUTDAVICULTORFRONT-XLID-FRONTID-NAMICID-WEEDERID-XLVENTRALX-TREME

Maintenance that uses this task

MaintenanceMachine families
MM-5 · Maintenance at 800 hours
AL-CALHALMOND-3BASIC-LBASIC-PBIOCOMBICONDORCULTIFRUTDAVICULTORDAVICULTOR 2.0DEADEFEAHECO-CUTECOFEEDECOTRIMEFIC-PFRONT-XLFRTI-DUSTI-GREENID-AID-DUALID-FRONTID-NAMICID-REVID-REXID-ROLLID-TERRAID-WEEDERID-XLLAT&GONAKIRIOLIXPFOPFPPFS-iPFS-i-CPROFEEDPRUNEXPV-LPV-L-RPV-SETOPV-TUNELPV-TUNEL-RPV-VIEWPV-VIEW-RPVORANNAREV-2RUNDERSURFEEDTD-FASTTD-KERRTD-LTD-RTD-SOTD-VIDTRIM-PROV-DUALV1V5VENTRALX-TREMEX10-TILLERgdgd

Associated resources

There are no associated resources