| ACT-1 · General greasing. | | 00:10 |
| ACT-2 · Lubrication of the bearings and shafts of the cutting module. | | 00:10 |
| ACT-3 · Grease drive and drag chains. | | 00:10 |
| ACT-4 · Grease hydraulic extension. | | 00:15 |
| ACT-5 · Grease roller bearings. | | 00:10 |
| ACT-6 · Grease metal wheel bearings. | | 00:10 |
| ACT-7 · Grease intervines. | | 00:10 |
| ACT-8 · Grease probe. | | 00:10 |
| ACT-9 · Thorough cleaning, drying and general oiling. | | 00:40 |
| ACT-10 · Grease the cranks of the cutter bars. | | 00:10 |
| ACT-11 · Grease auger chains. | | 00:10 |
| ACT-12 · Grease the hitch joint. | | 00:10 |
| ACT-13 · Grease ERI joints. | | 00:10 |
| ACT-14 · Cleaning of nozzles. | | 00:15 |
| ACT-15 · Cleaning of the herbicide system filter. | | 00:15 |
| ACT-16 · Cleaning of the filter of the disinfectant system. | | 00:15 |
| ACT-17 · Clean the fan and radiator of the cooler. | | 00:10 |
| ACT-18 · Emergency button operation review. | | 00:10 |
| ACT-19 · Review of clearances of the disc shafts. | | 00:30 |
| ACT-20 · Review of the alignment of the ERI set. | | 00:10 |
| ACT-21 · Review and adjustment of clearances in ERI. | To be performed at an authorised workshop | 00:00 |
| ACT-22 · Check status of connections in ERI. | | 00:10 |
| ACT-23 · Check the condition of the cutting discs. | | 00:15 |
| ACT-24 · Sharpening of teeth of cutting discs. | To be performed at an authorised workshop | 02:30 |
| ACT-25 · Check the condition of knives and counter-knives. | | 00:15 |
| ACT-26 · Retightening of screws on module bearings. | | 00:30 |
| ACT-27 · Review and adjustment of disc stackups. | | 00:15 |
| ACT-28 · Check of disc bearing clearances. | | 00:20 |
| ACT-29 · Check the tank's oil level. | | 00:15 |
| ACT-30 · Check oil level of the multiplier group. | | 00:15 |
| ACT-31 · Check the condition of bearings of the drive shafts. | | 00:10 |
| ACT-32 · Review and adjustment of the separation between right and left | | 00:10 |
| ACT-33 · Tire pressure check. | | 00:10 |
| ACT-34 · Review of the electrical connection. | | 00:15 |
| ACT-35 · Adjustment of the Nylon/Bronze Plates of the slides. | | 00:30 |
| ACT-36 · Revision of synchronization of chassis extension cylinders. | | 00:30 |
| ACT-37 · Check the condition of the cups, shaft and arm springs. | | 00:20 |
| ACT-38 · Status check of stylus rod and probe shaft. | | 00:30 |
| ACT-39 · Review of inter-vine bearing clearances. | | 00:30 |
| ACT-40 · Check the status of sensors and their wiring. | | 00:00 |
| ACT-41 · Revision of ball joint wear cylinder and retractable pin. | | 00:20 |
| ACT-42 · Checking for oil leaks in hydraulic motors. | | 00:15 |
| ACT-43 · Replacement of spring traction and probe tensioning screws. | | 00:15 |
| ACT-44 · Oil change in multiplier group. | | 00:15 |
| ACT-45 · Check screws and absence of cracks in the coupling piece. | | 00:10 |
| ACT-46 · Replacement of herbicide system filters. | To be performed at an authorised workshop | 00:20 |
| ACT-47 · Replacement of filters in the disinfectant circuit. | To be performed at an authorised workshop | 00:20 |
| ACT-48 · Replacement of probe knurled prisoners (drag shaft). | To be performed at an authorised workshop | 00:20 |
| ACT-49 · Replacement compression spring and probe ball. | To be performed at an authorised workshop | 00:00 |
| ACT-50 · Replacement of pinion and keyway in hydraulic motors. | | 00:00 |
| ACT-51 · Replacement of the Nylon/Bronze plates of the slides. | To be performed at an authorised workshop | 00:00 |
| ACT-52 · Replacement of inter-strain cylinder ball joints. | To be performed at an authorised workshop | 00:00 |
| ACT-53 · Replacement of ERI springs. | To be performed at an authorised workshop | 00:00 |
| ACT-54 · Review of engine performance. | To be performed at an authorised workshop | 00:00 |
| ACT-55 · Review of pump performance. | To be performed at an authorised workshop | 00:00 |
| ACT-56 · Checking for oil leaks in hydraulic cylinders. | To be performed at an authorised workshop | 00:00 |
| ACT-57 · Review and regulation of the tare weight of the pressure limite | To be performed at an authorised workshop | 00:00 |
| ACT-58 · Workshop set-up 800 hours. | | 00:00 |
| ACT-59 · Replacement of inter-strain valve wear kit. | To be performed at an authorised workshop | 00:00 |
| ACT-60 · Replacement of inductive sensor wiring of the probe. | To be performed at an authorised workshop | 00:00 |
| ACT-61 · Retractable bolt replacement. | To be performed at an authorised workshop | 00:00 |
| ACT-62 · Replacement of the probe drag axis. | To be performed at an authorised workshop | 00:00 |
| ACT-63 · Hydraulic oil change tank (10w30, hv68). | | 00:00 |
| ACT-64 · Replacement of the gas shock absorber of the cutter bar. | To be performed at an authorised workshop | 00:00 |
| ACT-65 · Replacement of the arm springs. | To be performed at an authorised workshop | 00:00 |
| ACT-66 · Pump replacement. | To be performed at an authorised workshop | 00:00 |
| ACT-67 · Replacement of knives and counter-knives. | To be performed at an authorised workshop | 00:00 |
| ACT-68 · Workshop set-up 2400 hours. | To be performed at an authorised workshop | 00:00 |
| ACT-69 · Checking for finger wear. | | 00:00 |
| ACT-70 · ID-ROLL head side change. | | 00:00 |
| ACT-71 · Check the condition of the rotor blades. | | 00:00 |
| ACT-72 · Replacement of the rotor blades. | To be performed at an authorised workshop | 00:00 |
| ACT-73 · Check the condition of the rotor sprockets. | To be performed at an authorised workshop | 00:00 |
| ACT-74 · Check the condition of the roller blades. | To be performed at an authorised workshop | 00:00 |
| ACT-75 · Check the condition and tension of the chain. | | 00:00 |
| ACT-76 · Review of the correct functioning of the braking system. | To be performed at an authorised workshop | 00:00 |
| ACT-77 · Cleaning of the exit of the augers. | | 00:00 |
| ACT-78 · Revision of synchronization of lifting cylinders. | To be performed at an authorised workshop | 00:00 |
| ACT-79 · Condition check of roller bearings. | | 00:00 |
| ACT-80 · Grease cutter bar blades. | | 00:00 |
| ACT-81 · Replacement of suction filter. | To be performed at an authorised workshop | 00:00 |
| ACT-82 · Replacement of high pressure filter. | | 00:00 |
| ACT-83 · Replacement of the return filter. | To be performed at an authorised workshop | 00:00 |
| ACT-84 · General condition of the machine. | | 00:00 |
| ACT-86 · Grease tripuntal. | | 00:00 |
| ACT-87 · Grease cylinder ball joint. | | 00:00 |
| ACT-88 · Verify the absence of cracks in welding and screws in the tie. | | 00:00 |
| ACT-89 · Lubrication of the cutter bar cranks. | | 00:00 |
| ACT-90 · Grease of the hitch joint. | | 00:00 |
| ACT-91 · Revision of safety valves. | | 00:00 |
| ACT-92 · Grease chrome extension tubes. | | 00:00 |
| ACT-93 · Oil level check in gearboxes. | | 00:00 |
| ACT-94 · Retightening of screws, nuts and fittings. | | 00:00 |
| ACT-95 · Light cleaning (excess grease, dust or mud). | | 00:00 |
| ACT-96 · Oil level of the multiplier group. | | 00:00 |
| ACT-97 · Oil change in multiplier unit (SAE90). | | 00:00 |
| ACT-98 · Grease major joints. | | 00:00 |
| ACT-99 · Review of knives and counter-knives. | | 00:00 |
| ACT-100 · Sharpening of the cutter bar blades. | | 00:00 |
| ACT-101 · Review and adjustment of the perpendicularity of the head. | | 00:00 |
| ACT-102 · Changing blades. | | 00:00 |
| ACT-103 · Tightening of fittings and condition of hydraulic pipes. | | 00:00 |
| ACT-104 · Review of inter-vine bearing clearances. (Replacement of grease | | 00:00 |
| ACT-105 · Sensor regulation. | | 00:00 |
| ACT-106 · Check the tension of the auger chains. | | 00:00 |
| ACT-107 · Checking the condition of the wheels, cracks, crystallization, | | 00:00 |
| ACT-108 · Check the condition of the door closing rubbers. | | 00:00 |
| ACT-109 · Replacement of the Nylon/Bronze mast plates and telescopic guid | | 00:00 |
| ACT-110 · Revision of ball joint wear and spring shaft. | | 00:00 |
| ACT-111 · Replacement of hydraulic roller extension bearings. | To be performed at an authorised workshop | 00:00 |
| ACT-112 · Checking the straps of the cutter bars. | | 00:00 |
| ACT-113 · Replacement of the dispenser outlet filter. | To be performed at an authorised workshop | 00:00 |
| ACT-114 · Grease bearings. | | 00:00 |
| ACT-115 · Changing cable ties. | | 00:00 |
| ACT-116 · Change of inter-strain pressure kit. | To be performed at an authorised workshop | 00:00 |
| ACT-117 · Replace roller bearings. | | 00:00 |
| ACT-118 · Checking oil leaks in interstrain cylinders. | | 00:00 |
| ACT-119 · Invert drive or replacement axes (Probe axis in simple model). | To be performed at an authorised workshop | 00:00 |
| ACT-120 · Changing the filters of the hydraulic power plant. | | 00:00 |
| ACT-121 · Hydraulic pressure control and regulation. | | 00:00 |
| ACT-122 · Grease grease of the cutting module. | | 00:00 |
| ACT-123 · RPM inductive sensor wiring change. | To be performed at an authorised workshop | 00:00 |
| ACT-124 · Replacement of the probe spring kit (spring + screw). | | 00:00 |
| ACT-125 · Replacement of the oil filter in pressure (ERI). | To be performed at an authorised workshop | 00:00 |
| ACT-126 · Complete overhaul and tuning of the machine by specialized tech | To be performed at an authorised workshop | 00:00 |