MM-4 · Maintenance at 400 hours

Maintenance to perform on the machine after 400 hours of operation.

Tasks for this maintenance

14 maintenance tasks

TaskMachine families
ACT-32 · Review and adjustment of the separation between right and left
BASIC-LBASIC-P
ACT-36 · Revision of synchronization of chassis extension cylinders.
BIOCOMBICULTIFRUTDAVICULTORECO-CUTFRONT-XLID-FRONTID-NAMICID-ROLLID-XLRUNDERX-TREMEX10-TILLER
ACT-37 · Check the condition of the cups, shaft and arm springs.
COMBICULTIFRUTDAVICULTORX10-TILLER
ACT-38 · Status check of stylus rod and probe shaft.
BIOCOMBICULTIFRUTDAVICULTORFRONT-XLID-FRONTID-NAMICID-WEEDERID-XLVENTRALX-TREME
ACT-39 · Review of inter-vine bearing clearances.
BIOCOMBICULTIFRUTDAVICULTORFRONT-XLID-FRONTID-NAMICID-WEEDERID-XLVENTRALX-TREME
ACT-41 · Revision of ball joint wear cylinder and retractable pin.
BIOCOMBICULTIFRUTDAVICULTORFRONT-XLID-FRONTID-NAMICID-WEEDERID-XLVENTRALX-TREME
ACT-75 · Check the condition and tension of the chain.
DEADEFECOFEEDI-DUSTPROFEEDSURFEED
ACT-102 · Changing blades.
RANNA
ACT-103 · Tightening of fittings and condition of hydraulic pipes.
AL-CALHALMOND-3BASIC-LBASIC-PBIOCOMBICONDORCULTIFRUTDAVICULTORDAVICULTOR 2.0DEADEFEAHECO-CUTECOFEEDECOTRIMEFIC-PFRONT-XLFRTI-DUSTI-GREENID-AID-DUALID-FRONTID-NAMICID-REVID-REXID-ROLLID-TERRAID-WEEDERID-XLLAT&GONAKIRIOLIXPFOPFPPFS-iPFS-i-CPROFEEDPRUNEXPV-LPV-L-RPV-SETOPV-TUNELPV-TUNEL-RPV-VIEWPV-VIEW-RPVORANNAREV-2RUNDERSURFEEDTD-FASTTD-KERRTD-LTD-RTD-SOTD-VIDTRIM-PROV-DUALV1V5VENTRALX-TREMEX10-TILLERgdgd
ACT-104 · Review of inter-vine bearing clearances. (Replacement of grease
Machine family compatibility has yet to be completed
ACT-105 · Sensor regulation.
REV-2
ACT-106 · Check the tension of the auger chains.
I-DUST
ACT-107 · Checking the condition of the wheels, cracks, crystallization,
I-DUST
ACT-108 · Check the condition of the door closing rubbers.
I-DUST

Available in a future release